Supervision of unloading, draft survey, sampling and preparation of samples for a further analyses. We begin the inspection by photographing the vessel, the sealed ship holds and the cargo. After a vessel inspection we perform a draft survey. We collect data on the vessel's timetable, crew documentation, vessel documentation and weather report. We perform an inspection of warehouses, storing conditions and supervision of unloading. Meanwhile, samples are taken and prepared for further analyses. After the rock phosphate is unloaded, we take photographs of the empty ship’s warehouse. The entire procedure is performed in accordance with the client's instructions. At the end of the inspection a report about the unloading of the goods is provided to a client.